 Area Road Construction

 


Brittmoore Road (A)
Limit From Clay Road
Limit To South of Tanner Road
Keymap 449G
Notes Proposed 5-lane concrete roadway with storm sewer system and traffic signal upgrades. The project will be bid once utility conflicts have been resolved. Currently scheduled for bidding in the 2nd quarter 2007.

Project Name Kuykendahl Road
Limit From FM 1960
Limit To  
Keymap 331V
Notes Proposed intersection improvements include depressing Kuykendahl Road under FM 1960. Engineering design is in progress. Clearing activity is complete and utility relocations are in progress. The project design has been forwarded to TxDOT, for final review and bidding purposes. Roadway construction activity is expected to commence 1st/2nd quarter 2007 and will take approximately 19-22 months to construct.

Project Name Grant Road
Limit From Copeland Drive
Limit To SH 249
Keymap 369F
Notes Proposed 5-lane concrete pavement with storm sewer system, including offsite drainage outfall improvements. Clearing activity is complete and the actual bid/start date of roadway improvements is contingent on completion of utility relocations; however, Precinct Four's goal is to bid this project in the 1st quarter 2007

Project Name Hollister Drive
Limit From Beltway 8
Limit To FM 1960
Keymap 410R
Notes Proposed 4-lane concrete boulevard section with storm sewer system and offsite storm water detention. Segment 1 from Beltway 8 to West Greens Road is currently in the design phase. Segment 2 from West Greens Road to Bourgeois Road and Segment 3 from Bourgeois Road to FM 1960 are currently in preliminary engineering Phase

Project Name Kuykendahl Road (Phase II)
Limit From Rhodes Road
Limit To FM 2920
Keymap 290V
Notes Proposed 5-lane asphalt pavement section with combination open ditch and storm sewer system. Kuykendahl Road between Rhodes Road and FM 2920 is currently in the award phase.

Project Name Aldine Westfield Road
Limit From Beltway 8
Limit To FM 1960
Keymap 373V
Notes Project consists of upgrading approximately 6 miles of 2-lane asphalt road to 4-lane concrete boulevard section with storm sewer system, bridge improvements, left turn lanes, and traffic signals. Project improvements were designed and are being constructed in four segments. Segment A (Beltway 8 to Simmans Road), Segment B (Simmans Road and Hydro 55) and Segment C (Hydro 55 to Farrell Road) are currently under construction with construction completion scheduled by the third quarter of 2007. Segment D (Farrell Road to FM 1960) construction activity was completed June 2003.

Project Name Greens Road
Limit From Old Greens Road
Limit To Aldine Westfield Road
Keymap 373P
Notes Proposed 4-lane concrete boulevard section with storm sewer system, medians and median openings, left turn lanes at public streets and traffic control devices. Construction commenced on April 4, 2006 with anticipated completion in the 1st quarter 2007.

Project Name West Greens Road
Limit From East of SH 249
Limit To Hollister Road
Keymap 370K
Notes Proposed 4-lane concrete boulevard, including storm sewer system, drainage outfall, storm water detention, curbs, median and median openings, bridges over Greens Bayou and over railroad track. Project will be designed and constructed in two segments; A) from east of SH 249 to Cutten Road and B) from Cutten Road to Hollister Road. Project is currently in the design phase

Project Name Cutten Road
Limit From Greens Bayou
Limit To FM 1960
Keymap 370U
Notes Proposed 4-lane concrete boulevard, including storm sewer system, drainage outfall, storm water detention, curbs, median and median openings, and turn lanes to all public streets. Precinct 4 anticipates construction completion by the 3rd quarter 2008.

Project Name Gosling Road
Limit From Kuykendahl Road
Limit To FM 2920
Keymap 250Z
Notes Proposed 2-lane asphalt roadway with combination storm sewer/ ditch improvements between Kuykendahl Road and FM 2920 is in the design phase

Project Name Grand Parkway
Limit From US 290
Limit To IH 45
Keymap 325U
Notes Proposed 4-lane divided roadway also known as SH 99. Managed by The Grand Parkway Association (GPA). For additional information contact GPA, at (713) 965-0871

Project Name CLAS Project 1
Limit From Kuykendahl Road @ Louetta Road
Limit To  
Keymap 331B
Notes Changeable Lane Assignment Signal System. Project improvements include the deployment of a Changeable Lane Assignment Signal System (CLAS) at Kuykendahl Road at Louetta Road intersection. CLAS provides the ability to integrate operations between the traffic signal control system and the CLAS application allowing lane assignments to change with traffic patterns. Additional improvements include right turn lanes and intersection management. Project is currently in the design phase.

Project Name FM 2100
Limit From 2.1 miles north of Wolf Road
Limit To FM 1485
Keymap 259N
Notes Pursue alignment study and right of way mapping for ultimate 150-foot right of way. Project is currently in the study phase.

Project Name CLAS Project 2
Limit From North Eldridge Parkway @ West Little York Rd
Limit To  
Keymap 408Z
Notes Changeable Lane Assignment Signal System. Project improvements include the deployment of a Changeable Lane Assignment Signal System (CLAS) at the intersection of North Eldridge Parkway and West Little York Road. CLAS provides the ability to integrate operations between the traffic signal control system and the CLAS application allowing lane assignments to change with traffic patterns. Additional improvements include right turn lanes and intersection management. Project

Project Name Tanner Road
Limit From Brittmoore Park Drive
Limit To Brittmoore Road
Keymap 449
Notes Widen to 4-lane asphalt pavement with continuous turn lane, combination roadside ditches and storm sewer system, bridge replacement and traffic signalization at Brittmoore Park Drive. Project is currently under construction and we anticipate construction completion 1st quarter 2007.

Project Name Ella Boulevard (1)
Limit From Gears Road
Limit To Rush Creek Drive
Keymap 372K
Notes Proposed installation of a 4-lane concrete boulevard section with storm sewer system including bridge over Greens Bayou. Project is currently in preliminary engineering phase

Project Name Jones Road
Limit From US 290
Limit To FM 529
Keymap 409P
Notes Proposed installation of 4-lane concrete boulevard section with storm sewer system, detention, railroad crossing and traffic signalization from US 290 to FM 529.

Project Name Stuebner Airline Road
Limit From Spring Cypress Road
Limit To FM 2920
Keymap 290
Notes Proposed improvements including upgrading from a 2-lane asphalt pavement to a 4-lane concrete boulevard section with storm sewer system. Roadway improvements will be designed and constructed in two segments (Segment A from Spring Cypress Road to Thora Lane and Segment B from Thora Lane to FM 2920). Both segments are currently in preliminary engineering phase.

Project Name T C Jester Boulevard (A)
Limit From North of Spears Road
Limit To South of FM 1960
Keymap 331
Notes Proposed installation of a 4-lane concrete boulevard section with storm sewer system and offsite detention. Project is currently in the preliminary engineering phase

Project Name T C Jester Boulevard (B)
Limit From Ivy Falls Drive
Limit To Cypresswood Drive
Keymap 331
Notes Proposed installation of a 4-lane concrete boulevard section with storm sewer system including a bridge over Cypress Creek. Project is currently in design phase.

Project Name Kuykendahl Road (A-B)
Limit From FM 2920
Limit To Augusta Pines Drive
Keymap 290
Notes Improvements will be designed and constructed in two segments (Segment A from FM 2920 to Willow Creek and Segment B from Willow Creek to Augusta Pines Drive). Proposed widening improvements consist of a 4-lane asphalt pavement with continuous left turn lane, combination roadside ditches and storm sewer system, bridge over Willow Creek, traffic signal upgrades. Both segments are currently in preliminary engineering phase.

Project Name Tomball Outfall Ditch
Limit From Graham Drive
Limit To Barbara Street
Keymap 288L
Notes Proposed installation of a box culvert system and extreme event swales capable of conveying a 100 year rainfall event. Project will be bid and managed by Harris County Flood Control District (HCFCD) in conjunction with HCFCD's M125 midreach and downstream improvements. Project is currently on hold pending pipeline relocation issues.

Project Name Ella Boulevard (4)
Limit From Louetta Road
Limit To Spring Cypress Road
Keymap 331
Notes Proposed widening to a 4-lane boulevard section including the northbound bridge over Seals Gully and installation of sidewalks on the east side of Ella Blvd between Sapling Trail and Spring Cypress Road. Project is currently in design phase and scheduled to bid 3rd quarter 2007.

Project Name Ella Boulevard (5A)
Limit From Spring Cypress Road
Limit To Northern Property Line of Klein ISD (near Falvel Road)
Keymap 291
Notes Proposed widening to a 4-lane boulevard section including the installation of missing sidewalk segments on the east and west side of Ella Boulevard between Spring Cypress Road and Falvel Road. Project is currently in design phase and scheduled to bid 4th quarter 2007.

Project Name Will Clayton Parkway
Limit From US 59
Limit To Wilson Road
Keymap 375
Notes Proposed 5-lane undivided asphalt pavement including a new bridge structure over the railroad tracks to accommodate westbound traffic. Project is currently in the design phase and will be designed/ constructed in 2 segments (Segment A - US 59 to South Houston Avenue and Segment B - South Houston Avenue). Currently scheduled to bid 4th quarter 2007.

Project Name Kuykendahl Road (C)
Limit From Augusta Pines Drive
Limit To Spring Creek
Keymap  
Notes Upgrade the existing 2-lane asphalt roadway to a combination 2-lane and 4-lane concrete pavement, treed medians, 8-foot unimproved shoulders with open ditches within a 160-foot right of way. This is a joint participation project between Harris County Precinct Four and The Woodlands Road Utility District No.1. Harris County will pursue utility relocations and fund 100% of the construction cost. The Woodlands Road Utility District No.1 has agreed to provide engineering design. Project initiation is pending.

Project Name East Richey Road
Limit From Hardy Road
Limit To Aldine Westfield Road
Keymap 333
Notes Proposed improvements include combination 4-lane concrete boulevard section and 5-lane concrete section with storm sewer system. Project is currently in preliminary engineering phase and scheduled to bid 4th quarter 2007.

Project Name Boudreaux Road
Limit From 2500' west of SH 249
Limit To 3500' east of SH 249
Keymap  
Notes Extension and realignment including construction of transitions to ultimate intersection. Construction is contingent on installation of TxDOT's SH 249 main lane improvements scheduled for letting 3rd quarter 2009.

Project Name Perry Road
Limit From FM 1960
Limit To SH 249
Keymap  
Notes Improvements will be designed and constructed in two segments (Segment A from FM 1960 to Mills Road and Segment B from Mills Road to SH 249). Proposed improvements include widening from an existing 2-lane asphalt pavement with roadside ditches to a 4-lane concrete boulevard section with storm sewer system, offsite detention, and signalization at Lou Edd Road and Mills Road intersections. Both segments are currently in preliminary engineering phase and scheduled to bid 4th quarter 2007.

Project Name T C Jester Boulevard (C)
Limit From Cypresswood Drive
Limit To Spring Cypress Road
Keymap  
Notes Proposed improvements include widening between Springton Lane and Glenmere Lane including an extension of the existing boulevard section between Center Court Drive and Spring Cypress Road. Project is currently in the preliminary engineering phase.

Project Name Spring Cypress Road
Limit From Telge Road
Limit To SH 249
Keymap  
Notes Final alignment recommendations are under review.

Project Name T C Jester Boulevard (D)
Limit From Slashwood Lane
Limit To Louetta Road
Keymap  
Notes Proposed extension of existing boulevard. Construction commenced October 4, 2006 and is scheduled for completion on February 1, 2007.

Project Name T C Jester Boulevard (E)
Limit From Alvin A Klein Boulevard
Limit To FM 2920
Keymap  
Notes Proposed extension of existing boulevard. Project is currently in the design phase

Project Name Falvel Road/ Ella Boulevard (5B)
Limit From Ella Boulevard
Limit To North of FM 2920
Keymap  
Notes Proposed upgrade to a 4-lane boulevard section including the appropriate traffic signal modifications and intersection improvements at FM 2920. Project is currently in preliminary engineering phase.

 

 

 


 

Click for the latest Cypress weather forecast.
 


 

Events Calendar local events in Cypress & NW Houston
 


 

Traffic Lights

Cy-Fair Schools Report Card

Cypress Local News

Vintage Park on Louetta & 290 building a new shopping center, medical center & a Central Market

New Page 1


Home | Forum | Contact

© Copyright 2007 by MyCypressDirectory.com